I have studied many Visual Management Deployments on several
manufacturing factories, and I have found a big misunderstanding of Visual
Management tool, this have called my attention on the last days due the company where I’m
consulting is a manufacturing plant with more than 30 CNC , Lathes , ,Metal
stamping and bending machines.
One of the big opportunities this company had; was related to the lack of Visual Management, therefore,
I teached them about the ANDON system and when they implemented the full process,
more than 80% of the Idle Time on Machine was eliminated, the defects where
reduced 10% , down time was reduced 30% etc.
I encouraged them to see the operators as surgeon in
operation room , and the engineers (Quality , Manufacturing , Production etc.)
to assist the operators like nurses help the surgeon.
Many companies think they have Visual Management, but
instead they have, Genba white Boards Reports , that, do not promotes the
Management Operation Actions as many Lean practitioners may think.
The numbers on that white boars just tell the history of the
yesterday day , like an autopsy report , noting to do just cry if numbers are bad or celebrate if the numbers are ok.
To install white boards on Genba; just attack the
information flow from PC systems reports ( KPI’s) to people awareness; but hardly promotes actions on real times to
fix a problem on real moment - time ; like the ANDON system does.
Visual Management is: the act or skill of controlling and
making decisions about a manufacturing business operations.
The Visual Management objectives are:
•
Addresses performance issues and keeps people
focused on the real job that add value.
•
Helps people feel, see, hear, and touch problems,
potential defects, and enhance actions required to gain competitive advantage
and improve performance.
•
Improve the operator performance by use of
signals that alert the support of Quality , Engineering , Maintenance and
Supervisors.
Therefore, none Visual Management Deployment is complete if
you don’t have both: Communication Genba Boards and ANDON lights system in place.
The team and the Lean Managers should analyze how effective
the White boards deployed are on floor. Are the white board and information adding
real value? Or where those White boards implemented just because the corporate
says do it; if the last is the case, then you have Lean Fake only.
In other hand there are implementation of White Boards that
enhance the operations efficiency, those are a real tool for Operation Management,
those are value add.
The ANDON system efficiency is in terms of how well the 6
big losses have been reduced, in other words, you should measure the ANDON implementation
effectiveness, based on Idle Machine Time Reduction, Operator Waiting Time Reduction,
Changeover Reduction, Defects Reduction ect.
The Visual Management and especially the ADON system, needs discipline
and Management Empowerment and it is not easy not at all; but the benefices are
wonderful.
andon system great
ResponderBorrarAndon system help improve production quality
ResponderBorrarI cannot thank lemeridian funding service enough and letting people know how grateful I am for all the assistance that you and your team staff have provided and I look forward to recommending friends and family should they need financial advice or assistance @ 1,9% Rate for Business Loan .Via Contact : . lfdsloans@lemeridianfds.com / lfdsloans@outlook.com. WhatsApp...+ 19893943740. Keep up the great work.
ResponderBorrarThanks, Busarakham.
Andon system w Polsce.
ResponderBorrar