miércoles, 30 de septiembre de 2015

Tsurube System ( よくバケツ ) – Pull System (JIT)

Many people call Tsurube as system, however, from my point of view and based on my experience in Japanese companies, is a Method into the Pull System (JIT). Tsurube combines FIFO (First In First Out) with Kanban, promoting, sequencing and the correct leveling of inventories at the same time.



Tsurube is the Japanese word for “well bucket”. As I have commented, it is a method of the pull system, a material replenishment method used when there is the middle process step is physically separated from the upstream and downstream processes by lead-time due to distance and/or batch processing. A “bucket” (container of unprocessed material) is sent down the “well” (the remote process) and at the same time a full “bucket” (processed parts) is returned up from the well.


Tsurube is not easy to implement because it requires a very good quality in processes and a good up time of the machine, since any interruption or variation breaks the FIFO sequencing.
However many companies require this method or in other words must implement immediately, hence the importance of having someone with extensive experience in the implementation.



This Tsurube method,  is used to maintain a continuous flow when there are interruptions such as process off-line or off-site and must have a batch system.
Used when the product leaves the production cell lines or because the process, can not, be in the cell (Kilns, painting, heat treatments, anodizing, plating, ect) and operates as follows.



A supermarket finished products located at the end of the line, which has predetermined quantity of material, usually a PITCH, in this example it will be 30 minutes.

Once the amount is removed; then a kanban signal its send to the process A, which can be the pacemaker; which prompts you to start producing parts (quantity = pitch) is sent.

Usually the FIFO system is used to move the product to process B. Process B also, have and process the same quantity and this is passed to the process that we have offline. (Process C)

And this last process the same amount to the process C is passed to end the cycle Process D and then to SMKT Finish Goods; ant his process is repeated as often as needed.


It is very important to consider the SWIP   (Standard Work In Process) the usual way to calculate is the following.

SWIP = [Total Lead Time =(Transportation Lead Time + Manufacturing Lean Time)] / Takt Time.

The SWIP (two buckets) maintains continuous flow through a batch or outside process. Transportation of materials is never empty in either direction and the arrival of the bucket to the well process is a signal to produce. It is in effect an instance of a non-card type production instruction kanban ; it is a FIFO process sequencing.


There are three golden rules for this Tsurube method:
1.- Respect the FIFO sequence
2.- Quantity shipped must equal amount received
3.- Do not send more parts if those sent were not received.

Zero Defects and TPM must be implemented before or at same time (in parallel).

I hope this information will be helpful in your next kaizen event.



jueves, 23 de octubre de 2014

Pull Production Systems 生産システムを引いて- The benefits and a brief description.

Push Production Systems: a forecast of future demand drives production
scheduling and material replenishment.  Planned orders are used to authorize
production or move materials – usually in batch mode

Push Production Systems are…
    • Inherently complex and inflexible
    • Usually computer based (no visible system)
    • Labor intensive, requiring significant labor-hours to keep the system accurate and up-to-date
    • Incapable of reacting quickly or accurately to the frequent, small demand changes common to production operations

A Pull Production System has three major tasks:
    • Get materials to the shop floor based on actual consumption
    • Move work-in-process (WIP) through the shop based on actual customer demand
    • Provide a mechanism for continuously improving the production processes

If the meaning of production control is truly understood, inventory control is unnecessary.
                                              -- Taiichi Ohno




Safety Stock is WASTE
Safety stock is excess inventory in a system to account for variations
in:
    • Demand
    • Lead time
    • Supplier performance
    • Poor quality
    • Differences between calendar days and work days
    • E.g., Production works on Saturday, but suppliers don’t deliver on Saturday








Kanban:

Kanban is a Japanese word, which loosely translated means sign or card
We use Kanban signals to pull product through the process, AND to
replenish raw material
Use Kanban when processes are separated
    • Lines with multiple back ends
    • Outside suppliers
    • Feeder cells
    • Semi-finished goods
    • Finished goods with our customers!




2-Bin Replenishment System

Goals of a 2-bin system:
    • Ensure operator always has parts
    • Ensure operator does not have to leave bench to find parts
    • Ensure material availability status is VISIBLE
    • Minimize the amount of raw material kept on the production floor



Kanban and Materials Management

Small parts: use the container/bin as Kanban signal
    • It is the container that goes back and forth for replenishment
Large / expensive parts: use Kanban card Where possible raw
material should be removed from stores (warehouse) and put on the
production floor in point-of-use (POU) locations.  Strive to eliminate
stores.
    • Appropriate quantities in POU depends on:
    • physical size
    • material cost
    • frequency of usage
    • frequency of replenishment





Material Handling Function

In a continuous flow cell, if operators abandon their stations to retrieve parts, the adjacent operations will quickly shut down.  A separate material handling role will need to be responsible for part retrieval, removal of empty part containers, and handling of part scrap/fallout








Principles:
Consumption is the signal for activity
Signal is located in the producing
area
Producing area is buffered from
extreme variation in demand

Benefits:
Simplifies planning and control system
Converts shop floor into an assembly line
Controls production through adherence to
pull rules

    • standard containers
    • standard quantities
    • authorized production