This article was written based on my experience as consultant.
After many Kaizen event I have found there is 2 misunderstandings about how
calculate the Number of Operators that are needed to run a production line or
manufacturing cell.
When you implement standardized work a Takt Time base on customer demand
must first be established for the area in question, for example 30 seconds TT,
this is equal to set a rate of 120 UPH (Units per Hour).
Therefore; the next question is how many workers are needed in the
manufacturing area, at this rate?
The answer depends on the total work content in the area and relation to demand ( TT).
It's also known as graph of “Takt Time vs Manual Cycle Time”, in many
industries.
The more work content, the greater the number of workers that will be
required; the less overall work content, the fewer workers that are needed.
I have found there is a misunderstanding of Overall Work Content, many
people take the Cycle Time complete (Machine + Manual) and that is not ok, they
must use the “Manual” Overall Work
Content (Total Manual Cycle Time)
Please see this example.
The calculation shows that is possible to run this Manufacturing Cell with just 3 operators.
Misunderstanding 2:
There is other misunderstanding this is about the representation of TT,
many people don’t understand this concept how interpret and calculate the
Quantity of operators when they have operators working in parallel.
For example; when there are operations that are not possible to be
separated, the activity must be done from the start to the end by one operator at time; and if the cycle time is greater than Takt Time; then you need use
more than one operator to cover the rate needed, this means to have two or more
operators working in parallel, for this case the Takt Time must be different.
You should never use the average of those operators as the Manual Work
Content, you need represent as it is and make the calculations using other Takt
Times equivalent.
Please see this example.
The calculation shows that is possible to run this Manufacturing Cell with just 5 operators; please note that here there is two Takt Times, but don't get confuse at the end the Cell will run at 30 Seconds of Takt Time; equivalent to 120 UPH. The operators 1 and 2 must works at 3 process in sequence (Press, Trim and Spring).
I hope this be useful for you in your next Kaizen event.
a good place to apply in training
ResponderBorrarGreat information provided. I appreciate your work.
ResponderBorrarmba executive chandigarh
The performance of Green Belts can be evaluated on the basis of projects completed or certification earned.
ResponderBorrarGreen Belt Training in India